Italy is currently finalising the design of its capacity remuneration mechanism. The provisional capacity payment, introduced in 2004, is to be replaced by a market-wide reliability option scheme. This paper provides an in-depth description of the Italian mechanism and presents a critical analysis of its design.


Palabras clave: Capacity Remuneration Mechanisms; Reliability options; Resource adequacy; Flexibility; Design elements; Italy


Fecha de publicación: 2017-11-02.



Cita:
P. Mastropietro, F. Fontini, P. Rodilla, C. Batlle, Critical analysis of the «new» Italian capacity remuneration mechanism, 2nd AIEE Energy Symposium «Current and Future Challenges to Energy Security», Roma (Italia). 02-04 noviembre 2017.


    Líneas de investigación:
  • *Diseño y regulación de mercados energéticos